TDA

TDA Freight Report Buddy

PPH Rate Calculator · Each segment: pieces × 4 = PPH  ·  Avg = mean of all segment PPHs

Window: 18:00z20:00z
CAPACITY UTILIZATION
TIME (z) ACTUAL PCS ACTUAL PPH PLANNED PCS PLANNED PPH
📖 HOW TO USE THIS CALCULATOR
Pull data from Fly-Portal Ops Clock · 2 hrs before aircraft cutoff
STEP 1 — FLY-PORTAL
Open Fly-Portal Ops Clock. Set your filters and click Apply Filters.
📅 Start Date
⏰ Start Time
Path: G2A
Apply Filters
⚙️ Set Start Time = 2 hrs before cutoff
STEP 2 — HOVER EACH POINT
Hover over each 15-min data point. Read Actual and Planned from the tooltip.
08:45 (UTC-0700)
Actual77
Required802
Planned625
⚠️ Skip "Required" — not used
STEP 3 — ENTER & REPORT
Type each segment's Actual and Planned pieces into the matching row. PPH calculates instantly.
TIME
ACT PCS
ACT PPH
PLN PPH
18:00z
77
308
2,500
📋 Copy report text above when done
📋 AMAZON ROLLED FREIGHT REPORT
Auto-generated · Copy and paste into your report
✅ Copied to clipboard!